A Hundred Miles on a Wire: How Post Falls Lit the Silver Valley Mines

Did you know the brick powerhouse at Post Falls was not built mainly to light the little mill town beside it? When Washington Water Power finished the plant in 1906, its most important customers were hard-rock mines nearly 100 miles away in the Silver Valley. The electricity generated at the falls would travel to those mines on a high-voltage transmission line billed at the time as the longest in the world.

The site had humbler beginnings. Frederick Post, the German immigrant millwright who gave the town its name, built a 20-foot-high timber-crib dam across the north channel of the Spokane River to divert water to his sawmill. After that mill was destroyed by fire in 1902, Washington Water Power purchased Post's site and set out to dam all three channels of the river where it splits around the islands just nine miles below the outlet of Coeur d'Alene Lake.

The mining connection was planned from the start. Silver Valley mines were still dependent on energy produced by wood-fired and coal-fired boilers, and Washington Water Power signed delivery contracts with six Silver Valley mining companies, including Bunker Hill in Kellogg, to power the mines instead. In the summer of 1906 the company began construction of a one-hundred-mile, sixty-thousand-volt transmission line from the new plant toward the mining district, a line purported to be the longest in the world at that time.

The plant itself rose quickly in the middle channel, the deepest and most confined of the three channels, with the highest head for energy production. Its dam, 431 feet long and 31 feet tall, forms the upstream wall of a 175-foot brick powerhouse built to house six turbine-generating units. The first three units entered service in 1906, a fourth followed in 1907 and a fifth in 1908, each rated at 2.25 megawatts, and a sixth unit was finally added in the 1980s, bringing the plant to 14.75 megawatts. Washington Water Power completed the three dams and the powerhouse in only two years, with construction technology limited to horses, manpower and ingenuity, and it even built a 60-kilovolt line from its Spokane plants to power the construction site itself.

More than a century later, the Post Falls development is still at work. Washington Water Power, known as Avista Corporation since 1999, operates six turbine-generating units in the powerhouse, and the facility continues to serve mines, mills, factories, businesses, railways and cities across northern Idaho and eastern Washington. It remains the most upstream dam on the Spokane River and the first of seven dams on the river. From the overlooks at Falls Park, visitors can still look down on the powerhouse and spillways and consider how a wire stretched a hundred miles from this gorge helped change mining in the Silver Valley and power in Post Falls at the same time.

Post Falls Idaho
Idaho History
Spokane River
North Idaho
Kootenai County
Falls Park

Copyright © 2026 Rocky Mountain Madman LLC - All rights reserved

Developed and Designed by Rocky Mountain Madman LLC